
Waste Heat Boilers: Shop and Site work
Schelde Exotech booked two new orders for the Zeeland Refinery located in Vlissingen.
A new Waste Heat Boiler shall be designed, fabricated and tested according ASME/PED.
To improve the lifetime a new type of Tube-Tubesheet weld shall be incorporated into the design.
Schelde Exotech shall also replace a complete bundle of an existing Waste Heat Bundle. This includes prefab at Schelde Exotech shop and replacing the bundle on Zeeland Refinery site.
News archive 2013
- 23/12/2013 Two orders in Exotic metals
- 21/11/2013 Two complex replacement jobs
- 30/10/2013 Invitation Corrosion Control Seminar
- 09/09/2013 New orders from Zeeland Refinery
- 28/08/2013 Columns Delivered
- 01/08/2013 Corrosion Control Technology Alliance
- 24/05/2013 2 Sets Reactors Delivered to Sadara
- 23/05/2013 Schelde Exotech Investor Technum
- 03/05/2013 Schelde Exotech Approved Special Process Supplier FMC Technolgies
- 28/02/2013 Schelde Exotech at the Maintenance Next 2013
- 17/02/2013 Two Tubular Reactors Delivered