Two complex replacement jobs

21 November 2013

Schelde Exotech gained two orders for shut-done’s next year.

For DOW Chemical a prefabbed duplex bottom-head including skirt shall be placed in situ on a reactor after removal of the old bottom and skirt.
During the shut-done of Zeeland Refinery the top head of a column shall be replaced. The welds are locally PWHT.
Both closing welds are “golden welds” according PRD.

Site by Alsjeblaft!